Formwork, steel fixing and concrete across Greater Sydney0404 999 0870410 977 997

Suspended slabs Sydney

Suspended slabs. Formed, propped, fixed and poured.

Concrete upper floors, balconies, garage-top terraces and podiums need a formwork deck that is level, tight and properly propped, steel that is exactly as drawn, and a pour that is planned around pump reach and crew size. We do the three stages together.

Where suspended slabs come up

  • Concrete first floors on double-storey homes and duplexes, for sound and fire performance and a solid feel underfoot.
  • Garage-top terraces and decks, with falls, set-downs and waterproofing details built in at the formwork stage.
  • Sloping blocks where a suspended ground floor is cheaper and cleaner than metres of fill and retaining.
  • Podiums and car park lids on townhouse and small apartment sites.
  • Mezzanines and plant decks in commercial and industrial buildings.
  • Balconies, walkways, stairs and landings.

How we build the deck

Props or frames go in on sole plates to the engineer's spacing, then bearers, joists and the formply soffit, set to level with a laser and checked again after loading. Edge forms, band beams and drop panels are built in, set-downs for wet areas and tiles formed, and penetrations for services boxed where the drawings and the plumber agree they go. Back-propping on the floor below goes in before the pour, not after. All of it is built to AS 3610 and to the propping notes for the job.

Reinforcement and pour

Bottom mats go in on chairs sized for the soffit cover, then beam cages, then top steel on standees so it does not get walked down during the pour. Trimmer bars go around every penetration. After the inspection we pour with a boom pump where there is reach, a line pump where there is not, screed to the levels and finish to the spec. Stripping happens when the engineer's strength and time requirements are met, with back-props staying in until they say otherwise.

Working with other systems

If the builder has specified permanent metal formwork or precast flooring planks, we do the propping, edge forms, reinforcement and pour on top of it. We also form and pour the stairs, landings and lift pits that go with it.

What to expect

Suspended slabs are where sequencing earns its keep

Deck, steel and pour on one calendar

Three separate subbies on a suspended slab means three sets of dates that have to line up. With KM the deck finishes when the steel starts and the steel finishes when the inspection is booked.

Tight sites handled

Inner-city and beachside blocks with no room for a boom pump get a line pump, props carried in by hand and a pour planned around the street. We have done it; it just needs planning.

Props left where they belong

We mark which back-props must stay and tell the builder in writing. Stripping early to make room for the next trade is how suspended slabs get damaged, so we do not do it.

Also from the same crew

Related work

Concreting

Slabs on ground, footings and piers, suspended slab pours, driveways, paths and shed slabs. Pumped, screeded, finished and cured to the engineer's spec.

  • House, garage and shed slabs
  • Footings, piers and retaining wall bases
  • Driveways, crossovers and paths
  • Trowel, broom and exposed finishes
More about concreting

Formwork

Boxing and edge boards for slabs on ground, full propped decks for suspended slabs, columns, walls, stairs and retaining walls. Built to strip clean.

  • Slab edge boards and footing boxing
  • Suspended slab decks and band beams
  • Columns, walls, stairs and pits
  • Strip-out and clean-up included
More about formwork

Steel fixing

Mesh, bars, trench mesh, footing and pier cages, starter bars and cover, fixed to the schedule and ready for the engineer's inspection.

  • Mesh and bar to the reo schedule
  • Footing, pier and column cages
  • Starter bars, dowels and trimmers
  • Supply arranged or fix your steel
More about steel fixing

Straight answers

Suspended slabs questions

How long until you can strip a suspended slab?

It depends on the span, the load, the concrete strength gain and the engineer's instructions. Often the soffit formwork comes down after one to two weeks with back-props left in place for longer, sometimes up to 28 days. We follow the engineer's stripping notes for the job, not a generic rule.

Can you pour a suspended slab on a tight inner-city site?

Yes. We use a line pump where a boom pump cannot set up, carry props and materials in by hand where there is no vehicle access, and plan the concrete deliveries around the street and the neighbours. Tell us about access early so it is priced correctly.

Do you do balconies and cantilevers?

Yes. Cantilevers need the top steel exactly where the engineer put it and the propping left in until the concrete has the strength to carry itself, both of which we take seriously.

Can you work with permanent metal formwork or precast planks?

Yes. On jobs where the builder has specified a permanent metal deck or precast planks, we do the propping, edge formwork, reinforcement and pour on top of the system, plus the in-situ stairs and landings that go with it.

More questions and answers

Send us the plans. We'll send you a price.

Email the slab plan and engineer's details, or call and talk it through. We quote from the drawings, not off a rate card, so the number holds.

Call 0404 999 087 Get a quote