Formwork, steel fixing and concrete across Greater Sydney0404 999 0870410 977 997

Sydney formwork, steel fixing and concreting

Formwork, steel fixing and concrete. One crew, start to finish.

KM does the three stages that make or break a slab: the boxing, the reo and the pour. You deal with one crew, one quote and one set of dates. Residential and commercial work across Greater Sydney.

  • Formwork, steel and concrete from one crew
  • Work to the engineer's drawings
  • Residential and commercial
  • Greater Sydney

What we do

Three trades. One phone number.

Each one is a trade in its own right and we take each one seriously. Together they are a slab done once, properly.

Concreting

Slabs on ground, footings and piers, suspended slab pours, driveways, paths and shed slabs. Pumped, screeded, finished and cured to the engineer's spec.

  • House, garage and shed slabs
  • Footings, piers and retaining wall bases
  • Driveways, crossovers and paths
  • Trowel, broom and exposed finishes
More about concreting

Formwork

Boxing and edge boards for slabs on ground, full propped decks for suspended slabs, columns, walls, stairs and retaining walls. Built to strip clean.

  • Slab edge boards and footing boxing
  • Suspended slab decks and band beams
  • Columns, walls, stairs and pits
  • Strip-out and clean-up included
More about formwork

Steel fixing

Mesh, bars, trench mesh, footing and pier cages, starter bars and cover, fixed to the schedule and ready for the engineer's inspection.

  • Mesh and bar to the reo schedule
  • Footing, pier and column cages
  • Starter bars, dowels and trimmers
  • Supply arranged or fix your steel
More about steel fixing

Most asked for

The full package

House slabs

Raft, waffle pod and strip footing slabs for new homes, duplexes, granny flats and extensions. Set out, formed, fixed, inspected and poured by the one crew.

  • Raft and waffle pod slabs
  • Strip footings, piers and beams
  • Granny flats, duplexes and extensions
  • Inspection booked and passed before the pour
More about house slabs

Suspended slabs

Conventional propped decks, band beams, balconies and stairs for first floors, terraces, podiums and mezzanines. Deck, reo and pour by one crew.

  • Props, bearers, joists and formply decks
  • Band beams, drop panels and cantilevers
  • Balconies, stairs and landings
  • Reo and pour with permanent metal formwork too
More about suspended slabs

Why one crew

The handover is where slabs go wrong

On a lot of jobs the formworker, the steel fixer and the concreter are three different businesses. The formworker finishes and leaves. The steel fixer turns up two days later and finds a set-down in the wrong spot. The concreter arrives on pour day and the inspection has not been booked. Everyone blames everyone, and the builder chases three phones.

KM takes that handover out of the job. The people who box the slab are the people who tie the steel and the people who stand on it when the truck arrives. If a level is out, we find it before the steel goes in. If the engineer wants a change at inspection, the crew that built it fixes it there and then. If the pump needs to move, we already know the site.

It is not complicated. It is just fewer people to chase and fewer places for the job to fall over.

How a job runs

From drawings to a stripped, swept slab

  1. 01

    Send the drawings

    Slab plan, engineer's details and the site address. We call with questions, then price the whole job in writing.

  2. 02

    Set-out and prep

    Levels checked against the survey. Beam and pier excavation coordinated, edge boards and formwork built.

  3. 03

    Steel fixed as drawn

    Mesh, bars, cages and chairs to the engineer's schedule, with cover checked before anyone else looks at it.

  4. 04

    Inspection

    We book around your engineer or certifier and walk the job with them. Anything they want changed is fixed on the spot.

  5. 05

    Pour and finish

    Concrete ordered to spec, pump booked, crew sized for the pour. Screeded, finished and cured the way the drawings say.

  6. 06

    Strip and clean

    Formwork stripped when the engineer allows, back-props left where required, site left tidy for the next trade.

Who we work with

Builders mostly. Everyone welcome.

Builders and project managers

Programs slip when three subbies do not line up. Book one. We give you dates for each stage and keep them.

Owner-builders and homeowners

We explain what the engineer's drawings mean for your slab, what has to happen before we can pour, and in what order.

Landscapers, pool and shed companies

Retaining wall footings, pool surrounds, shed slabs and plinths, quoted quickly and slotted between bigger jobs.

Duplex and townhouse developers

Multiple slabs, suspended floors, podiums and stairs across a site, sequenced so your framers are not waiting.

Jobs we take on

If it needs boxing, reo or a pour, ask

  • House slabs: raft, waffle pod and strip footing
  • Granny flat, duplex and townhouse slabs
  • Suspended slabs, balconies and garage-top terraces
  • Strip footings, pad footings and bored piers
  • Retaining wall footings and capping beams
  • Columns, blade walls, stairs and landings
  • Driveways, crossovers, paths and patios
  • Shed, garage and workshop slabs
  • Warehouse floors and hardstands
  • Pool surrounds, coping slabs and plinths
  • Formwork-only and steel-only packages
  • Pour-only for builders with prep done

Photos

We are putting together a gallery of recent slabs, decks and stripped formwork. In the meantime, ask and we will send photos of similar jobs to yours, or put you in touch with a builder we have worked for.

Ask for photos

Straight answers

Questions we get asked

Do you do all three trades, or just formwork?

All three. Formwork, steel fixing and concrete placement are done by the same crew, which is the whole point. Builders with their own steel fixers or concreters can also book us for formwork only or steel only.

Do you work for homeowners or only builders?

Both. Most of our work is for builders, developers and project managers, but we quote direct for owner-builders and homeowners too, and we will explain the process in plain language.

What do you need from me to quote?

The engineer's drawings (slab plan and details), the site address, and a rough idea of when you want to pour. A site classification report helps. Email them to kmformsyd@hotmail.com or call 0404 999 087 and we will take it from there.

How far ahead should I book?

As early as you can once the engineer's drawings are approved. Lead times move with the season and the size of the job. Call and we will tell you honestly where the calendar is rather than promise a date we cannot keep.

Do you organise the concrete and the pump?

Yes, if you want us to. We order concrete to the engineer's specification, book the pump and coordinate delivery times on the day. Some builders prefer to supply concrete under their own account, and that is fine too.

Are you licensed and insured?

Ask for our licence number and insurance certificates when you request a quote and we will send copies with it. In NSW, residential concreting work over $5,000 including labour and materials must be done by a licensed contractor, so you should ask this of anyone pricing your slab.

How soon can we build on the slab?

Foot traffic after a day or two, frame set-out after about a week, full design strength at 28 days. Suspended slabs are loaded and stripped on the engineer's instructions, not a rule of thumb.

More questions and answers

Send us the plans. We'll send you a price.

Email the slab plan and engineer's details, or call and talk it through. We quote from the drawings, not off a rate card, so the number holds.

Call 0404 999 087 Get a quote