House slabs Sydney

House slabs in Sydney. Set-out to pour, one crew.

A house slab is three trades in a row: formwork, steel and concrete. KM does all three, so the footings, edge beams, reinforcement and pour are handled by people who were there for the set-out and will be there when the frame goes up.

Slab types we build

  • Raft (stiffened raft) slabs. Edge beams and internal beams dug into the ground, slab poured as one piece. The standard answer on much of Sydney's clay.
  • Waffle pod slabs. Polystyrene pods laid on a prepared pad with beams formed between them, sitting on top of the ground rather than dug in. Faster on flat, well-drained sites.
  • Strip footings with infill slab. Footings poured first, brickwork or blockwork up, then the slab. Common on extensions and older-style construction.
  • Piers and beams. Bored piers to rock or stable ground with beams spanning between them, for filled sites, steep sites and highly reactive clay.
  • Suspended ground floors where the block falls away. See suspended slabs.

Why the site classification matters

Every house slab in NSW is designed to AS 2870 from a site classification: A and S for sand and rock that barely moves, M for moderately reactive clay, H1 and H2 for highly reactive clay, E for extreme, and P for problem sites such as fill or soft ground. Much of Western and South West Sydney sits on shale-derived clay that classifies M to H2, which means deeper edge beams, more reinforcement and sometimes piers. The sandstone and sand country toward the coast is often A or S. The engineer designs for the class; we build exactly what they draw. If you do not have a classification report yet, get one before anyone prices the slab, because it changes the price more than anything else.

How a house slab goes

  1. Set-out and levels checked against the survey and the slab plan.
  2. Pad prepared, beams and trenches excavated, piers bored and poured if the design calls for them.
  3. Plumbing rough-in and termite treatment by your other trades, with us coordinating the timing.
  4. Pods, edge boards and formwork built, set-downs and step-downs formed.
  5. Vapour barrier laid and taped, reinforcement fixed and chaired to the schedule.
  6. Engineer and certifier inspection, with us on site.
  7. Pour, screed, finish and cure.
  8. Edge boards stripped and the site tidied for the frame carpenters.

Granny flats, duplexes and extensions

Secondary dwellings and duplexes are a big part of Sydney's building now, and the slabs are no less fussy than a full house. Extensions bring their own problems: matching existing floor levels, tying into old footings, and getting a pump and barrows to the back of a block. We have done plenty and we price them from the drawings like any other job.

Before the pour

What has to be true before a house slab gets poured

The drawings and the pegs agree

We check the set-out against the survey before we dig. If a boundary offset or a level does not match the plan, we stop and call. Fixing it on paper costs nothing; fixing it in concrete costs a lot.

Everything under the slab is done

Plumbing rough-in tested and signed off, termite treatment in, pods and membrane laid, penetrations sleeved. We coordinate the dates with your other trades.

The inspection has passed

The engineer and certifier see the steel before the concrete is ordered. We walk the job with them and fix any item on the spot so the pour date holds.

Also from the same crew

Related work

Concreting

Slabs on ground, footings and piers, suspended slab pours, driveways, paths and shed slabs. Pumped, screeded, finished and cured to the engineer's spec.

  • House, garage and shed slabs
  • Footings, piers and retaining wall bases
  • Driveways, crossovers and paths
  • Trowel, broom and exposed finishes
More about concreting

Formwork

Boxing and edge boards for slabs on ground, full propped decks for suspended slabs, columns, walls, stairs and retaining walls. Built to strip clean.

  • Slab edge boards and footing boxing
  • Suspended slab decks and band beams
  • Columns, walls, stairs and pits
  • Strip-out and clean-up included
More about formwork

Steel fixing

Mesh, bars, trench mesh, footing and pier cages, starter bars and cover, fixed to the schedule and ready for the engineer's inspection.

  • Mesh and bar to the reo schedule
  • Footing, pier and column cages
  • Starter bars, dowels and trimmers
  • Supply arranged or fix your steel
More about steel fixing

Straight answers

House slabs questions

How long does a house slab take?

From excavation to pour, usually one to two weeks for a single dwelling, depending on the site class, whether piers are needed and how quickly inspections can be booked. The pour itself is a morning. Allow another week before the frame goes up unless the engineer says otherwise.

Waffle pod or raft slab, which is better?

Neither is better in the abstract; the engineer chooses based on the site classification, drainage, levels and cost. Waffle pods sit on top of the ground and need less excavation, which suits flat, well-drained sites. Raft slabs are dug in and are often preferred on sloping or more reactive ground. We build both.

Do you organise the plumber and the termite treatment?

Those are the builder's or owner's trades, but we coordinate the timing with them so the rough-in and treatment are done and inspected before we lay pods and steel. On owner-builder jobs we will tell you the order things need to happen in.

What happens if the set-out pegs are wrong?

We check the pegs against the survey and the drawings before we dig. If something does not add up we stop and call you and, if needed, the surveyor. We will not pour a slab in the wrong place because the pegs said so.

Can you do just the footings or just the piers?

Yes. Footings only, piers only, or footings and slab in two stages for brick veneer and masonry jobs. Tell us what stage you need and we will quote that.

More questions and answers

Send us the plans. We'll send you a price.

Email the slab plan and engineer's details, or call and talk it through. We quote from the drawings, not off a rate card, so the number holds.

Call 0404 999 087 Get a quote