Formwork contractors Sydney

Formwork in Sydney. Set out right, propped properly, stripped clean.

Conventional timber and formply formwork for residential and commercial jobs: edge boards and boxing for slabs on ground, full decks for suspended slabs, columns, walls, stairs and retaining walls. We form it, then fix the steel and pour it if you want the whole job done by one crew.

Formwork we build

  • Slab on ground formwork. Edge boards, boxing for strip and pad footings, raft and waffle pod edge beams, step-downs, rebates and set-downs for wet areas.
  • Suspended slab formwork. Bearers, joists and formply soffits on props or frames. Band beams, drop panels, balconies and cantilevers, boxed penetrations and back-propping below. See suspended slabs.
  • Columns and walls. Box columns, round column formers, wall forms with ties and walers, blade walls, lift pits and small shafts.
  • Stairs and landings formed in place, flights and landings, with nosings and risers set to the architect's dimensions.
  • Retaining walls, capping beams, planter walls and pits.
  • Strip-out and clean-up. We strip when the engineer allows, de-nail, stack and remove our materials, and leave the slab ready for the next trade.

How we set out

Everything downstream depends on the set-out, so it gets done slowly. We pull levels with a laser, run string lines off the survey pegs, and check the dimensions against both the architectural and structural drawings. Finished floor levels, step-downs and set-downs are confirmed with the builder before anything is locked off. If the pegs and the plan disagree, we stop and call rather than build to the wrong one.

Propping, stripping and back-propping

Formwork and falsework are built to AS 3610 and to the engineer's propping notes. Stripping times come from the engineer, not from how busy the program is. On suspended work we leave back-props in place until the slab has taken its load, and we tell the builder clearly which props must not be touched.

Formwork only

Plenty of builders have their own steel fixers and concreters and just need a formwork crew who turns up when promised. We do formwork-only packages, and we are happy to coordinate with your other trades on inspection and pour dates.

How the job runs

What you can expect from a KM formwork package

Materials and props included

We supply the formply, timber, props and frames for the job and take them away afterwards. On larger decks we can work alongside your scaffold and prop hire if that is already arranged.

Checked before the steel goes in

Dimensions, levels, set-downs and penetrations are checked against the drawings before the steel fixers start, because that is the cheap time to fix a mistake.

Clean strip

Forms are oiled, tight and well braced, so edges come out crisp and faces come out clean. Stripping is done carefully to protect arrises and nosings, not ripped off with a bar.

Also from the same crew

Related work

Concreting

Slabs on ground, footings and piers, suspended slab pours, driveways, paths and shed slabs. Pumped, screeded, finished and cured to the engineer's spec.

  • House, garage and shed slabs
  • Footings, piers and retaining wall bases
  • Driveways, crossovers and paths
  • Trowel, broom and exposed finishes
More about concreting

Steel fixing

Mesh, bars, trench mesh, footing and pier cages, starter bars and cover, fixed to the schedule and ready for the engineer's inspection.

  • Mesh and bar to the reo schedule
  • Footing, pier and column cages
  • Starter bars, dowels and trimmers
  • Supply arranged or fix your steel
More about steel fixing

House slabs

Raft, waffle pod and strip footing slabs for new homes, duplexes, granny flats and extensions. Set out, formed, fixed, inspected and poured by the one crew.

  • Raft and waffle pod slabs
  • Strip footings, piers and beams
  • Granny flats, duplexes and extensions
  • Inspection booked and passed before the pour
More about house slabs

Straight answers

Formwork questions

Do you do formwork only, without the steel and concrete?

Yes. Formwork-only packages are common for builders with their own crews. We will coordinate with your steel fixer and concreter so inspections and pour dates line up.

Do you supply the formwork materials and props?

Yes. Formply, timber, props, frames and consumables are included in the quote and removed when we strip. If you already have scaffold or prop hire on site for a bigger job, we can work with it.

How long does the formwork stay up?

As long as the engineer says. Edge boards on a slab on ground can usually come off the next day. A suspended slab is often stripped after one to two weeks with back-props left longer, sometimes to 28 days, depending on span, load and the concrete's strength gain. We do not strip early to suit a program.

What is the difference between formwork and falsework?

Formwork is the mould the concrete is poured into: the ply, boards and edge forms. Falsework is the temporary structure that holds the formwork up, such as props, frames and bearers under a suspended slab. We build both.

Do you work to AS 3610?

Yes. AS 3610 is the Australian Standard for formwork, covering design, construction, loading and stripping. We build to it and to the engineer's documentation for the specific job.

More questions and answers

Send us the plans. We'll send you a price.

Email the slab plan and engineer's details, or call and talk it through. We quote from the drawings, not off a rate card, so the number holds.