What we fix
- Mesh. SL62 through SL102 as specified, lapped correctly and chaired to the right height. Trench mesh in footings and edge beams.
- Bar. N10 to N32 deformed bar, with N12, N16 and N20 the usual suspects on residential work. Cut and bent to schedule.
- Cages. Strip footing cages, pad footing mats, bored pier cages with ligatures, column and wall cages tied on the ground or in place.
- Starters, dowels and ties. Starter bars for walls and columns, dowels at construction joints, cogs and hooks where drawn.
- Suspended slab reinforcement. Top and bottom mats, band beam and drop panel cages, balcony and stair reinforcement, trimmer bars around penetrations.
Cover, chairs and ties
Cover is the concrete between the steel and the outside world, and it is what stops reinforcement rusting. The drawings set the cover for each element and we hold it with bar chairs matched to the surface: plastic chairs on the ground and membrane, wire or steel chairs on formply. Bars are tied at every intersection the engineer requires and laps are measured, not eyeballed. If the drawings say a lap is 40 bar diameters, that is what you get.
Supply and scheduling
We can order the reinforcement from the supplier, cut and bent to a bar schedule we check against the drawings first, or fix steel you have already bought. Either way we confirm quantities before anything is ordered so there are no shortfalls on the day.
Ready for inspection
Before your engineer or certifier arrives we walk the job ourselves: cover, laps, chairs, starters, trimmers around penetrations, and anything the drawings call out specifically. If something is not right we fix it before the inspection, not during it. Our aim is a pass first time so the pour goes ahead on the day it was booked.