Steel fixers Sydney

Steel fixing to the engineer's drawings. Nothing less, nothing missing.

Reinforcement is what the inspector looks at hardest and what nobody sees once the pour is done. We fix it the way it is drawn: right bar, right spacing, right cover, tied off and chaired so it stays put when the concrete goes in.

What we fix

  • Mesh. SL62 through SL102 as specified, lapped correctly and chaired to the right height. Trench mesh in footings and edge beams.
  • Bar. N10 to N32 deformed bar, with N12, N16 and N20 the usual suspects on residential work. Cut and bent to schedule.
  • Cages. Strip footing cages, pad footing mats, bored pier cages with ligatures, column and wall cages tied on the ground or in place.
  • Starters, dowels and ties. Starter bars for walls and columns, dowels at construction joints, cogs and hooks where drawn.
  • Suspended slab reinforcement. Top and bottom mats, band beam and drop panel cages, balcony and stair reinforcement, trimmer bars around penetrations.

Cover, chairs and ties

Cover is the concrete between the steel and the outside world, and it is what stops reinforcement rusting. The drawings set the cover for each element and we hold it with bar chairs matched to the surface: plastic chairs on the ground and membrane, wire or steel chairs on formply. Bars are tied at every intersection the engineer requires and laps are measured, not eyeballed. If the drawings say a lap is 40 bar diameters, that is what you get.

Supply and scheduling

We can order the reinforcement from the supplier, cut and bent to a bar schedule we check against the drawings first, or fix steel you have already bought. Either way we confirm quantities before anything is ordered so there are no shortfalls on the day.

Ready for inspection

Before your engineer or certifier arrives we walk the job ourselves: cover, laps, chairs, starters, trimmers around penetrations, and anything the drawings call out specifically. If something is not right we fix it before the inspection, not during it. Our aim is a pass first time so the pour goes ahead on the day it was booked.

Why it matters

Reinforcement done properly is cheaper than reinforcement done twice

Failed inspections cost days

A failed pre-pour inspection means a cancelled concrete order, a cancelled pump and trades pushed back. We check the steel against the schedule before the engineer does.

Cover is not negotiable

Too little cover and the steel rusts and spalls the concrete; too much and the slab loses strength. We chair it to the drawing and keep it there through the pour.

Steel for other crews

Builders with their own formworkers and concreters use us for the steel fixing alone. We fit into your sequence and leave the job inspection-ready.

Also from the same crew

Related work

Concreting

Slabs on ground, footings and piers, suspended slab pours, driveways, paths and shed slabs. Pumped, screeded, finished and cured to the engineer's spec.

  • House, garage and shed slabs
  • Footings, piers and retaining wall bases
  • Driveways, crossovers and paths
  • Trowel, broom and exposed finishes
More about concreting

Formwork

Boxing and edge boards for slabs on ground, full propped decks for suspended slabs, columns, walls, stairs and retaining walls. Built to strip clean.

  • Slab edge boards and footing boxing
  • Suspended slab decks and band beams
  • Columns, walls, stairs and pits
  • Strip-out and clean-up included
More about formwork

House slabs

Raft, waffle pod and strip footing slabs for new homes, duplexes, granny flats and extensions. Set out, formed, fixed, inspected and poured by the one crew.

  • Raft and waffle pod slabs
  • Strip footings, piers and beams
  • Granny flats, duplexes and extensions
  • Inspection booked and passed before the pour
More about house slabs

Straight answers

Steel fixing questions

Do you supply the steel?

Either way works. We can order it from the reinforcement supplier, cut and bent to schedule, and include it in the quote. Or you supply the steel and we fix it. If you supply it, send us the bar schedule so we can check it against the drawings before delivery.

Who inspects the steel before the pour?

Usually the structural engineer, and on residential work often the principal certifier as well. We book the inspection around the pour date and walk the job with the inspector so anything they want changed is fixed there and then.

What cover do you use?

Whatever the drawings specify for that element. As a rough guide, concrete cast against the ground needs more cover than concrete cast against formwork, and external or exposed elements need more than internal ones. The engineer sets the number and we hold it with the right chairs.

Can you fix steel on another contractor's formwork?

Yes. We regularly do steel fixing only. We check the formwork dimensions and levels against the drawings before we start so we are not building the right steel into the wrong box.

What is the difference between SL72 and SL82 mesh?

The wire size. SL72 is 6.75 mm wire and SL82 is 7.6 mm wire, both at 200 mm centres. SL92 and SL102 are heavier again. The engineer picks the mesh for the slab design and we fix what is drawn. We never swap down to a lighter mesh to save money.

More questions and answers

Send us the plans. We'll send you a price.

Email the slab plan and engineer's details, or call and talk it through. We quote from the drawings, not off a rate card, so the number holds.

Call 0404 999 087 Get a quote