FAQ

Questions builders and homeowners ask us.

Straight answers about quoting, slabs, formwork, steel fixing and pour day. If yours is not here, call and ask.

General

Do you do all three trades, or just formwork?

All three. Formwork, steel fixing and concrete placement are done by the same crew, which is the whole point. Builders with their own steel fixers or concreters can also book us for formwork only or steel only.

Do you work for homeowners or only builders?

Both. Most of our work is for builders, developers and project managers, but we quote direct for owner-builders and homeowners too, and we will explain the process in plain language.

What do you need from me to quote?

The engineer's drawings (slab plan and details), the site address, and a rough idea of when you want to pour. A site classification report helps. Email them to kmformsyd@hotmail.com or call 0404 999 087 and we will take it from there.

How far ahead should I book?

As early as you can once the engineer's drawings are approved. Lead times move with the season and the size of the job. Call and we will tell you honestly where the calendar is rather than promise a date we cannot keep.

Do you organise the concrete and the pump?

Yes, if you want us to. We order concrete to the engineer's specification, book the pump and coordinate delivery times on the day. Some builders prefer to supply concrete under their own account, and that is fine too.

Are you licensed and insured?

Ask for our licence number and insurance certificates when you request a quote and we will send copies with it. In NSW, residential concreting work over $5,000 including labour and materials must be done by a licensed contractor, so you should ask this of anyone pricing your slab.

How soon can we build on the slab?

Foot traffic after a day or two, frame set-out after about a week, full design strength at 28 days. Suspended slabs are loaded and stripped on the engineer's instructions, not a rule of thumb.

Concreting

How much does concreting cost per square metre in Sydney?

Anyone who gives you a per-metre price before they have seen the drawings is guessing. Slab thickness, edge beams, site class, reinforcement, finish, pump access and how far the truck has to travel all move the number. Send us the engineer's drawings and the site address and you will get a written quote for the whole job, with the inclusions spelled out.

How soon can we walk or build on the new slab?

As a rule of thumb: foot traffic after 24 to 48 hours, light loads and frame set-out after about 7 days, and design strength at 28 days. Suspended slabs are different: loading and stripping follow the engineer's instructions, not a rule of thumb.

What strength concrete do you use?

Whatever the engineer specifies. Residential slabs are commonly N20 to N32; suspended slabs and commercial floors are often N32 or higher. We order to the drawings and keep the delivery dockets so you can see what went in.

Do you pour in the rain?

Not heavy rain. We check the forecast the day before and call it early. Covers handle light drizzle; a downpour on a fresh surface ruins the finish and weakens the top of the slab, so we would rather push the pour than take the risk.

Will you do a small job like a shed slab or a path?

Yes. We slot small jobs in between larger ones, so there may be a short wait for a date. Tell us the size and the access honestly and we will tell you honestly when we can do it.

Formwork

Do you do formwork only, without the steel and concrete?

Yes. Formwork-only packages are common for builders with their own crews. We will coordinate with your steel fixer and concreter so inspections and pour dates line up.

Do you supply the formwork materials and props?

Yes. Formply, timber, props, frames and consumables are included in the quote and removed when we strip. If you already have scaffold or prop hire on site for a bigger job, we can work with it.

How long does the formwork stay up?

As long as the engineer says. Edge boards on a slab on ground can usually come off the next day. A suspended slab is often stripped after one to two weeks with back-props left longer, sometimes to 28 days, depending on span, load and the concrete's strength gain. We do not strip early to suit a program.

What is the difference between formwork and falsework?

Formwork is the mould the concrete is poured into: the ply, boards and edge forms. Falsework is the temporary structure that holds the formwork up, such as props, frames and bearers under a suspended slab. We build both.

Do you work to AS 3610?

Yes. AS 3610 is the Australian Standard for formwork, covering design, construction, loading and stripping. We build to it and to the engineer's documentation for the specific job.

Steel fixing

Do you supply the steel?

Either way works. We can order it from the reinforcement supplier, cut and bent to schedule, and include it in the quote. Or you supply the steel and we fix it. If you supply it, send us the bar schedule so we can check it against the drawings before delivery.

Who inspects the steel before the pour?

Usually the structural engineer, and on residential work often the principal certifier as well. We book the inspection around the pour date and walk the job with the inspector so anything they want changed is fixed there and then.

What cover do you use?

Whatever the drawings specify for that element. As a rough guide, concrete cast against the ground needs more cover than concrete cast against formwork, and external or exposed elements need more than internal ones. The engineer sets the number and we hold it with the right chairs.

Can you fix steel on another contractor's formwork?

Yes. We regularly do steel fixing only. We check the formwork dimensions and levels against the drawings before we start so we are not building the right steel into the wrong box.

What is the difference between SL72 and SL82 mesh?

The wire size. SL72 is 6.75 mm wire and SL82 is 7.6 mm wire, both at 200 mm centres. SL92 and SL102 are heavier again. The engineer picks the mesh for the slab design and we fix what is drawn. We never swap down to a lighter mesh to save money.

House slabs

How long does a house slab take?

From excavation to pour, usually one to two weeks for a single dwelling, depending on the site class, whether piers are needed and how quickly inspections can be booked. The pour itself is a morning. Allow another week before the frame goes up unless the engineer says otherwise.

Waffle pod or raft slab, which is better?

Neither is better in the abstract; the engineer chooses based on the site classification, drainage, levels and cost. Waffle pods sit on top of the ground and need less excavation, which suits flat, well-drained sites. Raft slabs are dug in and are often preferred on sloping or more reactive ground. We build both.

Do you organise the plumber and the termite treatment?

Those are the builder's or owner's trades, but we coordinate the timing with them so the rough-in and treatment are done and inspected before we lay pods and steel. On owner-builder jobs we will tell you the order things need to happen in.

What happens if the set-out pegs are wrong?

We check the pegs against the survey and the drawings before we dig. If something does not add up we stop and call you and, if needed, the surveyor. We will not pour a slab in the wrong place because the pegs said so.

Can you do just the footings or just the piers?

Yes. Footings only, piers only, or footings and slab in two stages for brick veneer and masonry jobs. Tell us what stage you need and we will quote that.

Suspended slabs

How long until you can strip a suspended slab?

It depends on the span, the load, the concrete strength gain and the engineer's instructions. Often the soffit formwork comes down after one to two weeks with back-props left in place for longer, sometimes up to 28 days. We follow the engineer's stripping notes for the job, not a generic rule.

Can you pour a suspended slab on a tight inner-city site?

Yes. We use a line pump where a boom pump cannot set up, carry props and materials in by hand where there is no vehicle access, and plan the concrete deliveries around the street and the neighbours. Tell us about access early so it is priced correctly.

Do you do balconies and cantilevers?

Yes. Cantilevers need the top steel exactly where the engineer put it and the propping left in until the concrete has the strength to carry itself, both of which we take seriously.

Can you work with permanent metal formwork or precast planks?

Yes. On jobs where the builder has specified a permanent metal deck or precast planks, we do the propping, edge formwork, reinforcement and pour on top of the system, plus the in-situ stairs and landings that go with it.

Send us the plans. We'll send you a price.

Email the slab plan and engineer's details, or call and talk it through. We quote from the drawings, not off a rate card, so the number holds.