What we pour
- Slabs on ground. House slabs (raft, waffle pod, and strip footing with infill), garage and shed slabs, granny flat slabs, workshop and small warehouse floors.
- Footings and piers. Strip footings, pad footings, bored pier pours, retaining wall footings and capping beams.
- Suspended slabs. First floors, balconies, garage-top terraces and podiums on duplexes and small developments. See suspended slabs.
- Driveways, crossovers and paths. Plain, broom-finished or exposed aggregate, with crossovers formed to the council's specification where the driveway meets the kerb.
- Columns, walls and stairs poured into our own conventional formwork.
- Pool surrounds and coping slabs, ramps, plinths and equipment pads. Small jobs are welcome; just tell us the size up front.
Finishes
Steel trowel (helicopter) finish for internal slabs and garages. Broom finish where you need grip on driveways and ramps. Exposed aggregate on request. Formed edges, falls to drains, rebates for tiling and set-downs for wet areas are built into the formwork before the pour, not chased out later.
Pour day
A pour is the one part of the job you cannot undo, so we treat the day before as seriously as the day itself. The steel has passed inspection. The concrete is ordered to the grade and slump on the drawings, not whatever is cheapest that week. The pump is booked: a boom pump for most sites, a line pump where the truck cannot get close, barrows where nothing else fits. The crew is sized for the volume so nobody is chasing a cold joint.
On the day we place, screed to the levels, finish as specified, then cure it properly with curing compound or a wet cure as the engineer calls for. Control joints are cut when and where the drawings say.
Concrete only?
If you have your own formworkers and steel fixers, we will quote the placement and finishing on its own. We will want to look at the prep before we commit to the pour, because we are the ones standing on it when the truck arrives.