Formwork, steel fixing and concrete across Greater Sydney0404 999 0870410 977 997

Concreting across Sydney

Concreting in Sydney. Boxed, tied and poured by the same crew.

From the footings to the finished slab, KM does the concreting on the jobs we form and fix, and pour-only work for builders who already have the prep done. Residential and light commercial across Greater Sydney.

What we pour

  • Slabs on ground. House slabs (raft, waffle pod, and strip footing with infill), garage and shed slabs, granny flat slabs, workshop and small warehouse floors.
  • Footings and piers. Strip footings, pad footings, bored pier pours, retaining wall footings and capping beams.
  • Suspended slabs. First floors, balconies, garage-top terraces and podiums on duplexes and small developments. See suspended slabs.
  • Driveways, crossovers and paths. Plain, broom-finished or exposed aggregate, with crossovers formed to the council's specification where the driveway meets the kerb.
  • Columns, walls and stairs poured into our own conventional formwork.
  • Pool surrounds and coping slabs, ramps, plinths and equipment pads. Small jobs are welcome; just tell us the size up front.

Finishes

Steel trowel (helicopter) finish for internal slabs and garages. Broom finish where you need grip on driveways and ramps. Exposed aggregate on request. Formed edges, falls to drains, rebates for tiling and set-downs for wet areas are built into the formwork before the pour, not chased out later.

Pour day

A pour is the one part of the job you cannot undo, so we treat the day before as seriously as the day itself. The steel has passed inspection. The concrete is ordered to the grade and slump on the drawings, not whatever is cheapest that week. The pump is booked: a boom pump for most sites, a line pump where the truck cannot get close, barrows where nothing else fits. The crew is sized for the volume so nobody is chasing a cold joint.

On the day we place, screed to the levels, finish as specified, then cure it properly with curing compound or a wet cure as the engineer calls for. Control joints are cut when and where the drawings say.

Concrete only?

If you have your own formworkers and steel fixers, we will quote the placement and finishing on its own. We will want to look at the prep before we commit to the pour, because we are the ones standing on it when the truck arrives.

The details that matter

Three things we get asked about on every concreting job

Pump and access

We work out the pump before we price the job. Boom pump where there is room, line pump down a side passage, barrows on the tight ones. Access affects cost and we would rather say so up front.

Weather calls

We watch the forecast and make the call early. Light drizzle is manageable with covers; heavy rain means we reschedule. It is better to lose a day than a slab.

Joints and curing

Control joints and construction joints go where the engineer puts them, cut at the right time. Curing is part of the job, not an optional extra, because a slab that dries too fast cracks.

Also from the same crew

Related work

Formwork

Boxing and edge boards for slabs on ground, full propped decks for suspended slabs, columns, walls, stairs and retaining walls. Built to strip clean.

  • Slab edge boards and footing boxing
  • Suspended slab decks and band beams
  • Columns, walls, stairs and pits
  • Strip-out and clean-up included
More about formwork

Steel fixing

Mesh, bars, trench mesh, footing and pier cages, starter bars and cover, fixed to the schedule and ready for the engineer's inspection.

  • Mesh and bar to the reo schedule
  • Footing, pier and column cages
  • Starter bars, dowels and trimmers
  • Supply arranged or fix your steel
More about steel fixing

House slabs

Raft, waffle pod and strip footing slabs for new homes, duplexes, granny flats and extensions. Set out, formed, fixed, inspected and poured by the one crew.

  • Raft and waffle pod slabs
  • Strip footings, piers and beams
  • Granny flats, duplexes and extensions
  • Inspection booked and passed before the pour
More about house slabs

Straight answers

Concreting questions

How much does concreting cost per square metre in Sydney?

Anyone who gives you a per-metre price before they have seen the drawings is guessing. Slab thickness, edge beams, site class, reinforcement, finish, pump access and how far the truck has to travel all move the number. Send us the engineer's drawings and the site address and you will get a written quote for the whole job, with the inclusions spelled out.

How soon can we walk or build on the new slab?

As a rule of thumb: foot traffic after 24 to 48 hours, light loads and frame set-out after about 7 days, and design strength at 28 days. Suspended slabs are different: loading and stripping follow the engineer's instructions, not a rule of thumb.

What strength concrete do you use?

Whatever the engineer specifies. Residential slabs are commonly N20 to N32; suspended slabs and commercial floors are often N32 or higher. We order to the drawings and keep the delivery dockets so you can see what went in.

Do you pour in the rain?

Not heavy rain. We check the forecast the day before and call it early. Covers handle light drizzle; a downpour on a fresh surface ruins the finish and weakens the top of the slab, so we would rather push the pour than take the risk.

Will you do a small job like a shed slab or a path?

Yes. We slot small jobs in between larger ones, so there may be a short wait for a date. Tell us the size and the access honestly and we will tell you honestly when we can do it.

More questions and answers

Send us the plans. We'll send you a price.

Email the slab plan and engineer's details, or call and talk it through. We quote from the drawings, not off a rate card, so the number holds.

Call 0404 999 087 Get a quote