KM is a Sydney formwork, steel fixing and concreting business. Builders book us because one crew doing all three stages means fewer handovers, fewer surprises and a slab that passes inspection the first time.
What KM is
A formwork, steel fixing and concreting crew working across Greater Sydney on residential and light commercial jobs. House slabs, suspended floors, footings, retaining walls, columns and stairs, driveways and shed slabs. The business name is on the card: concrete, formwork, steel fixing. That is the whole offer, and we do all of it.
How we work
We quote from the engineer's drawings, in writing, with the inclusions listed, so the price holds. We check the set-out against the survey before we dig. We fix the steel to the schedule and check the cover before the engineer does. We order concrete to the specification on the drawings and keep the dockets. We strip when the engineer says, not when the program would like. And we leave the site clean for the next trade, because we are usually waiting on them too.
When something is wrong, with the pegs, the levels, the drawings or the weather, you hear about it early and from us. Fixing a problem on the phone is cheap. Fixing it in concrete is not.
Safety and compliance
Everyone on our crew holds a construction induction (white card). We provide safe work method statements for the job, complete site inductions where the builder runs them, and build formwork and falsework to AS 3610 and the engineer's documentation. Reinforcement is fixed to AS 3600 and the drawings. Slabs on ground are built to the AS 2870 design the engineer has produced for the site classification.
Licence and insurance details are provided with every quote; ask and we will send copies of the certificates.
Who you will deal with
Call either number on this site and you will speak to the people who run the jobs. There is no call centre and no sales team. The person who quotes your slab is the person who will be on site when it is poured.
What we stand on
Four things you can hold us to
We turn up when we said
Dates are given per stage and kept. If something outside our control moves one, you hear about it the same day.
We build what is drawn
The engineer designed it; we do not improvise on reinforcement, cover, concrete grade or stripping times.
We say so early
Wrong pegs, odd levels, missing details, bad weather: the earlier it is raised, the cheaper it is to fix.
We leave it clean
Stripped formwork removed, offcuts and tie wire picked up, slab swept. The next trade should be able to start.
Send us the plans. We'll send you a price.
Email the slab plan and engineer's details, or call and talk it through. We quote from the drawings, not off a rate card, so the number holds.